US Fleet Movements
U.S. Navy: What the USS John C. Stennis’ Deployment Does Not Mean
January 31, 2007 23 28 GMT
© Copyright 2007 Strategic Forecasting Inc. All rights reserved.
Summary
The Nimitz-class nuclear-powered aircraft carrier USS John C. Stennis departed San Diego on Jan. 20 after joining up with its carrier air wing in preparation for its deployment in the Persian Gulf. The timing of the deployment has led to speculation that the United States is putting the carrier and its strike group in the Gulf with the USS Eisenhower, which is currently deployed to the region, in order to increase pressure on Iran. However, this deployment is business as usual for the U.S. Navy as it moves the strike group in to support various military operations in the Middle East.
Analysis
The aircraft carrier USS John C. Stennis left San Diego on Jan. 20 for its scheduled cruise in the Persian Gulf in support of the U.S. Navy’s 5th Fleet operations in Afghanistan, Iraq and the Horn of Africa. This deployment has received attention from the media, which say the deployment is meant to increase pressure on Iran. However, the Nimitz-class, nuclear-powered Stennis’ main purpose will be to replace the USS Eisenhower when it concludes its cruise in April 2007. The Stennis’ deployment is nothing unusual.
The process culminating in the Stennis’ deployment to the Middle East began when the carrier arrived in its home port of Bremerton, Wash., on Jan. 8, 2005. Soon after that, she went into dry-docked planned incremental availability (DPIA), an 11-month overhaul and recertification process at the Puget Sound Naval Shipyard. Usually after completing a cruise, a U.S. aircraft carrier will return to its homeport and restart the maintenance and operations cycles. In the Stennis’ case, however, it went into DPIA before restarting the operations cycle.
After the DPIA was complete in December 2005, the Stennis underwent three months of routine sea trials in the East Pacific, followed by an inspection survey in April to certify the carrier’s suitability for operations. Since the inspection’s completion in May, the Stennis has been on a typical operations cycle for the U.S. Navy’s nuclear-powered aircraft carriers.
The length of any operation or cruise is limited not by the ship, but by the crew’s endurance. The high tempo of operations on a carrier takes a toll on the crew; cruises end when the crew has been deployed for six months with continuous 24-hour operations. When the cruise ends, the ship is checked over and any necessary repairs and refitting will be done. This gives the crew the chance to go on leave before returning to the ship at port and working routine maintenance, attending training schools or being reassigned. During this period, follow-on exercises and sustainment training will keep the carrier employable for an 18-month period until it is actually deployed. This is what the USS Ronald Reagan is doing from its home base of San Diego.
The carrier will then take part in several two- to three-week exercises that allow the crew to practice mission areas and integrate skill sets, essentially maintaining their qualifications. Before being deployed again, the carrier typically goes through a composite training unit exercise (COMPTUEX) followed by a joint task force exercise (JTFEX). The JTFEX serves primarily as a method of validation and can be cut short or eliminated if the carrier is rushed into deployment. The Stennis completed its COMPTUEX in mid-October 2006 and its JTFEX in the following month. During these exercises, the carrier’s air wing is assigned and its personnel participate in training and certification for carrier operation in preparation for deployment.
Normally, a carrier is deployed for six months and then in home port for 18 months, during which it participates in any number of short operations. The one notable exception to this standard occurred when U.S. President Jimmy Carter kept the USS Nimitz on deployment for 11 months straight, going from one hot spot to another.
For decades, a U.S. carrier has generally been on station in the Persian Gulf or the 5th Fleet area of operations. In 2003 the Navy adopted the Fleet Response Plan (FRP), which favors having multiple carriers in a general state of readiness instead of maintaining a single carrier in the Gulf. Though six-month deployments to the Middle East are still common — and require a great deal of planning and preparation — the FRP has changed the carrier fleet’s overall readiness posture. The FRP was designed to make the Navy more responsive to Washington’s maritime needs. And with the massive strike capability a carrier air wing brings to bear, a carrier deployment is often more of a political weapon than a military one.
The FRP calls for six carriers out of the total fleet of 12 to be “surge capable” — able to be under way in 30 days or fewer, with a follow-on surge of two more carriers within 90 days — at any time. Thus, instead of using the deployment date to schedule training, proficiency training begins as soon as a carrier emerges from its maintenance cycles. Less than six months after coming out of dry dock — and as soon as three months in an emergency — a carrier should be employable, or surge ready.
However, in the case of the 5th Fleet’s current operations, developments in Somalia and the Eisenhower’s shift in that direction are reminders of the military purpose of the current carrier rotations through the Gulf — continued support of operations in Iraq, including regular close air support sorties, and potential support for African Union peacekeeping operations in Somalia.
The Stennis will likely arrive in the Persian Gulf region in mid- to late February. This will give it about a two-month overlap with the Eisenhower which, since its arrival in the region in late October, has been moving between the Gulf, the Arabian Sea and the Indian Ocean.
The Stennis’ deployment to the Persian Gulf has been scheduled for months, so its movement there is not in response to anything Iran has recently done. The timing just happens to coincide with the recent U.S. decision to increase its force in Iraq and with statements from U.S. diplomats about increasing pressure on Tehran.
If the United States does decide to surge its naval capacity in the region and intensify its military pressure on Iran, the Eisenhower could remain in the Gulf past April. Meanwhile, the USS Harry S. Truman, which recently finished a round of flight deck certifications in the Atlantic in preparation for its 2007 deployment, could deploy as early as April. This could put the Truman in the Persian Gulf with the Stennis and the Eisenhower, should it stay over, placing three U.S. carrier strike groups in the region.
Even if the Eisenhower returns and the Truman moves into the region, the United States would demonstrate its ability to maintain two carriers in one place for an extended period of time. However, if this potential surge goes beyond three carrier strike groups, the USS Nimitz and the USS Roosevelt — like the Reagan — are at stages in their operational cycles at which they could be deployed on relatively short notice if needed.
The United States could have six carriers deployed to the Persian Gulf relatively quickly if it wanted to. If that were to occur, Tehran would certainly have reason to be concerned. In times of heightened geopolitical tension, the normal rotation of one carrier to replace another can set observers off. This is certainly not the first time; only a few months ago, similar speculation followed the Eisenhower across the Atlantic as it sailed to replace the USS Enterprise. However, the Stennis’ movement into the Persian Gulf is not abnormal.
No Comments »
No comments yet.
RSS feed for comments on this post.
Leave a comment
Comment Guidlines: This space is for commenting on the post above, the ideas, the context,the author. Your ideas, strong but civil, are appreciated. Long cuts and pastes from elsewhere are not. This is NOT the place to create your own private BLOG. Links to other articles are fine, if appropriate. Line and paragraph breaks are automatic; e-mail address are never displayed.
HTML allowed: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>



